How many days until Made by Google?
Google's annual hardware showcase unveiling next-generation Pixel phones and Gemini AI (2027 date & venue TBA).
Live interactive timer initializes below. JavaScript must be enabled.
NASA's Artemis III LEO Mission serves as the decisive orbital flight test bridging deep-space transit and sustainable human lunar exploration. Refocused as a roughly two-week crewed Low Earth Orbit (LEO) rendezvous and docking demonstration, echoing Apollo 9's landmark 1969 test flight, Artemis III validates Orion's live integration with commercial lunar landers before astronauts return to the lunar surface on Artemis IV.
The mission launches aboard NASA's Space Launch System (SLS) from Launch Complex 39B at Kennedy Space Center in Florida, carrying commander Randy Bresnik, pilot Frank Rubio, mission specialist Andre Douglas, and European Space Agency astronaut Luca Parmitano inside the Orion capsule.
Rather than departing immediately on a trans-lunar injection, Orion stabilizes in Low Earth Orbit to conduct closely choreographed flight-test milestones with commercial partner spacecraft already positioned in orbit.
In Earth orbit, Orion executes precision proximity maneuvers and hard-docking trials with commercial Human Landing System test vehicles developed by SpaceX (Starship HLS) and Blue Origin (Blue Moon Mark 2). Testing two distinct commercial lander architectures in LEO allows flight controllers in Houston to evaluate automated docking sensors, propellant boil-off margins, and structural loads safely within rapid Earth-return reach.
Just as Apollo 9 verified Lunar Module undocking and EVA life-support systems in Earth orbit before Apollo 11, the Artemis III crew enters docked lander cabins to verify environmental control and life support systems (ECLSS), cabin depressurization, communications relays, and next-generation Axiom AxEMU spacesuit interfaces across two weeks of orbital operations.
Upon completing docking and thermal soak validations, Orion undocks, executes a controlled deorbit burn via the ESA-built European Service Module, and splashes down under parachutes in the Pacific Ocean. The flight data gathered during Artemis III directly certifies integrated spacecraft readiness for the crewed lunar South Pole landing on Artemis IV.
Google's annual hardware showcase unveiling next-generation Pixel phones and Gemini AI (2027 date & venue TBA).
There are 289 days from today until Artemis III LEO Mission on September 1, 2027, and the countdown timer at the top of the page updates in real time.
Artemis III in 2027 is a crewed Low Earth Orbit (LEO) flight test modeled on the Apollo 9 mission. Rather than landing on the Moon, four astronauts will test rendezvous, docking, and integrated life-support operations between the Orion spacecraft and commercial Human Landing System vehicles in Earth orbit to retire technical risks ahead of Artemis IV.
Artemis III is designed to test proximity operations and docking between NASA's Orion spacecraft and commercial lunar lander flight-test vehicles from SpaceX (Starship HLS) and Blue Origin (Blue Moon Mark 2) in Low Earth Orbit.
NASA assigned commander Randy Bresnik, pilot Frank Rubio, mission specialist Andre Douglas, and European Space Agency (ESA) mission specialist Luca Parmitano to fly the crewed Artemis III Low Earth Orbit demonstration.
Artemis III launches atop NASA's Space Launch System (SLS) rocket from Launch Complex 39B at Kennedy Space Center in Florida. The crewed Earth-orbit mission is planned to last approximately two weeks (around 14 days) as astronauts validate docking adapters, communications, and thermal control systems.
Following the Low Earth Orbit rendezvous and docking demonstration on Artemis III, NASA's Artemis IV mission is targeted to carry astronauts back to the lunar surface near the Moon's South Pole.
During the docked Earth-orbit phase, astronauts evaluate crew transfer procedures, hatch pressurization, suit compatibility, and environmental control and life support systems (ECLSS) alongside next-generation Axiom Extravehicular Mobility Unit (AxEMU) hardware.
In March 1969, Apollo 9 tested the Lunar Module and Command Module docking and life support in Low Earth Orbit before Apollo 11 landed on the Moon. NASA structured Artemis III similarly to verify complex multi-spacecraft hardware in Earth orbit before committing crews to lunar descent.
The Artemis program operates under the multilateral Artemis Accords, partnering with the European Space Agency (ESA, providing the Orion European Service Module and crew member Luca Parmitano), the Japan Aerospace Exploration Agency (JAXA), and the Canadian Space Agency (CSA).